ADVERTISEMENT FOR BIDS LINCOLN AVENUE STORM WATER LIFT STATION UPGRADES [CONTRACT A - LIFT STATION] AND [CONTRACT B - UTILITIES] CITY OF FOND DU LAC FOND DU LAC COUNTY, WISCONSIN The City of Fond Du Lac will receive and accept bids ONLY through QuestCDN.com via the online electronic bid service (QuestvBid) for the construction of LINCOLN AVENUE STORM WATER LIFT STATION UPGRADES [Contract A - Lift Station] AND [Contract B - Utilities] until March 30, 2023 at 1:00 p.m. All bids will be downloaded and publicly read aloud during a virtual public bid opening that will be held at the day and time of the bid closing. All planholders will receive information via Quest on how to join the virtual meeting prior to the bid opening. A Pre-Bid conference will be held at 1:00 p.m. local time on March 24, 2023 at Lincoln Street Lift Station. Representatives of OWNER and ENGINEER will be present to discuss the Project. Bidders are encouraged to attend and participate in the conference. The work for which bids are asked includes the following: The City of Fond du Lac, Wisconsin is requesting qualified and responsive bids for multiple prime contracts to construct storm water lift station and utility upgrades. Lincoln Avenue Storm Water Lift Station Upgrade Contract A Lift Station: The work for which bids are requested shall include complete construction of a Storm water Lift Station and demolition of the existing lift station(s). The project includes project administration, private property pre- and post-construction surveys, construction perimeter fencing, erosion control, site grading, memorial relocation, dewatering, yard piping, utility services upgrades, private electrical service upgrades, existing flood wall protection, permeable pavers, fencing, restoration, etc. The lift station is a insulated cavity wall masonry block and brick building constructed over a sheet pile construct wet well that includes sheet pile and heavy steel framing, helical piles, dewatering, welding high performance coatings, cathodic protection, electrical, plumbing, HVAC, process mechanical, instrumentation and control, and SCADA enhancements. The lift station will contain a custom owner furnished contractor install (3) vertical axial flow propeller pump(s), Electrical Power Gear, and standby diesel engine generator set with automatic transfer switch. Work under this contract includes demolition of the existing Lincoln Ave Lift station and Thomas Street Lift Station. Bidders will be required to coordinate with multiple owner agents, owner finished equipment supplier, other contractors, and A/E. Lincoln Avenue Storm Water Lift Station and Upgrade Contract B Utilities: The work for which bids are requested shall include complete construction of a roadway and utilities needed for the upgrade of the proposed storm water lift station and demolition of the existing lift station(s). The project includes project administration, private property pre- and post-construction surveys, construction limits protection, traffic control, erosion control, site grading, dewatering, yard piping, private electrical service upgrades, concrete sidewalk, curb and gutter, asphalt paving, storm sewer construction, water main construction, sanitary sewer construction, restoration, etc. Bidders will be required to coordinate with multiple owner agents, owner finished equipment supplier, other contractors, and A/E. The anticipated Contract A will be substantial completion date is June 14, 2025 and final completion date is August 15, 2025. The anticipated Contract B will be substantial completion date is August 8, 2025 and final completion date is October 17, 2025 Planholders list will be updated interactively on our web address at http://www.msa-ps.com under Bidding. Copies of the BIDDING DOCUMENTS are available at www.questcdn.com. QuestCDN Vbid system requires Bidders to purchase BIDDING DOCUMENTS from QuestCDN. You may download the digital plan documents for $45 by inputting Quest eBidDoc #8244362 on the website's Project Search page. No bid will be opened unless the "Bidder's Proof of Responsibility" for 2023 is filed at least five days before the scheduled time for opening of bids. Reference is made to Section 66.0901(2) and (3) Wisconsin Statutes. The Director of Public Works decision as to qualifications shall be final. Bidder's attention is called to the fact that this contract includes a "Disclosure of Ownership" form. Section 66.0903 (12)(d) of Wisconsin Statutes requires that each bidder complete this form. No bid will be considered unless the prospective bidder has completed the form entitled "Disclosure of Ownership". No proposal will be accepted unless accompanied by a certified check or bid bond equal to at least 5% of the amount bid, payable to the OWNER as a guarantee that, if the bid is accepted, the bidder will execute and file the proper contract and bond within 15 days after the award of the contract. If after 15 days the bidder shall fail to do so, the certified check or bid bond shall be forfeited to the OWNER as liquidated damages. No bid may be withdrawn within 60 days after the actual date of the opening thereof. OWNER reserves the right to waive any informalities or to reject any or all bids. Published by authority of the City of Fond du Lac, Wisconsin on March 15 and March 22, 2023 CITY OF FOND DU LAC ENGINEER: Christopher Johnson, P.E. 160 South Macy Street PO Box 1050 Fond du Lac, WI 54936 CONSULTING ENGINEER: MSA Professional Services, Inc. 1230 South Boulevard Baraboo, WI 53913 Scott Chilson, P.E. (608) 355-8868 RUN: March 15, 22, 2023 WNAXLP